More Progress

9 Dec

The past couple of weeks on the construction project have seen some significant strides.  Below, you will see the latest:

 

1.  The curbs for the repaired parking lot surrounding our new children’s building were poured, taking us a few major steps closer to getting our back door and back parking lot back in operation!

Curbs being installed around the back parking lot.

Another shot of the curbs going in.

2.  The windows and doors for the building’s main entrance have been placed, and the building is now secure from the outside!

Glass and doors now cover the new entrance into the children's building.

3.  The elevator has been installed (NOTE:  After the children’s building opens, we will have two elevators in our facility — our existing elevator and the new one just installed in the children’s wing.)

The elevator has been installed!

4.  The decorative 1940′s era Spartan Trailer is being cut and installed as a featured portion of our “lounge” area at the top of the new monumental staircase.  For more details about the Trailer, see this post from May 2010.

A good shot of the trailer being cut to size at the top of our monumental staircase.

Up close shot of the trailer being cut to size.

Wood frames for the couches which will be placed inside the trailer once it is set in place.

Artist rendering of the trailer once completed.

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.